Kitchen remodeling is the most-requested project at Wilson & Co Design Build, and for good reason — the kitchen is where Northeast Florida families spend most of their waking hours at home. Whether you are upgrading builder-grade finishes in a Nocatee production home or gutting a dated kitchen in an established St. Augustine neighborhood, this guide breaks down what kitchen remodeling actually costs in our market in 2026.
Kitchen Remodel Cost Ranges in St. Augustine
Kitchen remodel costs in St. Augustine and St. Johns County fall into three tiers depending on scope, materials, and complexity.
| Remodel Level | Typical Cost Range | What’s Included |
|---|---|---|
| Minor Refresh | $25,000–$40,000 | Cabinet refacing or painting, new countertops, updated hardware, lighting upgrades |
| Mid-Range Renovation | $50,000–$80,000 | New custom cabinets, quartz countertops, tile backsplash, new appliances, updated plumbing fixtures |
| Full Gut Renovation | $80,000–$120,000+ | Complete demolition, layout changes, structural work, custom everything, premium appliances |
These ranges reflect St. Johns County pricing as of early 2026. Duval County (Jacksonville) runs approximately 10-15% lower for comparable work. Ponte Vedra and oceanfront properties trend 15-25% higher due to premium finish expectations and salt-resistant material requirements.
What Drives Kitchen Remodel Costs in Northeast Florida
Cabinetry (35-45% of Total Budget)
Cabinets are the single largest expense in any kitchen remodel. Stock cabinets from big-box stores start around $5,000-$8,000 for a typical kitchen. Semi-custom cabinets (Shiloh, Medallion) run $12,000-$25,000. Fully custom cabinets with soft-close, dovetail joints, and specialty storage start at $20,000 and can exceed $50,000 for large kitchens.
In Florida’s humidity, cabinet construction matters. We specify plywood boxes over particleboard — particleboard swells and deteriorates in our climate. Thermofoil doors (common in builder-grade kitchens) are the first finish to fail in Florida; solid wood or painted MDF doors last significantly longer.
Countertops (10-15% of Budget)
Quartz has become the default countertop in Northeast Florida for good reason: it is non-porous, requires no sealing, and handles our humidity without staining. Expect $50-$100 per square foot installed. Granite runs $40-$80. Marble is beautiful but requires ongoing sealing and is more prone to etching — we recommend it for bathroom vanities over kitchen counters.
Appliances (10-20% of Budget)
Standard appliance packages (Samsung, Whirlpool, KitchenAid) run $5,000-$10,000. Premium packages (Bosch, Thermador) run $10,000-$20,000. Professional-grade (Sub-Zero, Wolf, Viking) can exceed $30,000. We design kitchen layouts around your appliance selections — not the other way around.
Layout Changes and Structural Work
Moving walls, especially load-bearing walls, adds $5,000-$15,000 for engineering and beam installation. Moving plumbing (sink, dishwasher) on a concrete slab adds $2,000-$5,000 for slab cutting and rerouting. Electrical panel upgrades for modern appliance loads run $2,000-$4,000. These costs are worth it when they transform a closed galley kitchen into an open-concept space.
The Wilson & Co Kitchen Remodel Process
1. Consultation (Free)
We visit your home, discuss how you use your kitchen, and talk through budget ranges. No high-pressure sales — just an honest conversation about what is possible.
2. Design (2-3 Weeks)
Our team creates detailed kitchen designs including cabinet layouts, countertop templates, lighting plans, and material selections. You see exactly what your kitchen will look like before we start.
3. Material Selection
Visit showrooms with our guidance to select cabinets, countertops, tile, fixtures, and hardware. We have relationships with local suppliers that often provide contractor pricing.
4. Construction (6-12 Weeks)
Our crew handles demolition, structural work, plumbing, electrical, cabinet installation, countertop templating and installation, tile work, and final finish details. Daily cleanup keeps your home livable during the process.
5. Final Walkthrough
We walk through the completed kitchen together. Punch list items are addressed within days. We do not consider the project done until every detail meets our standards and yours.
How Long Does a Kitchen Remodel Take?
For a mid-range kitchen remodel in St. Augustine, expect 8-12 weeks from demolition to completion. The biggest variable is custom cabinet lead time — currently 6-8 weeks from order to delivery. We schedule the demolition and rough work to align with cabinet delivery so there is minimal downtime.
Minor refreshes (painting cabinets, new countertops, hardware swap) can be completed in 3-4 weeks.
Return on Investment
Kitchen remodels consistently deliver the highest ROI of any home renovation in the Northeast Florida market. A mid-range kitchen remodel typically returns 70-80% of its cost at resale. More importantly, a quality kitchen remodel makes your home sell faster — an increasingly valuable advantage in a market where days-on-market directly affects final sale price.
Get a Free Kitchen Remodel Estimate
Every kitchen remodel at Wilson & Co starts with a free consultation. Call (904) 792-6175 or contact us online to schedule a visit to your St. Augustine, Jacksonville, Ponte Vedra, or Nocatee home.
Ready to Start Your Project?
Contact Wilson & Co Design Build for a free consultation on your remodeling project.
